Case Study: Optimising Stability Storage for IVC Brunel Healthcare
- nadineagius87
- Aug 11
- 1 min read
Updated: Aug 18
MB3 Technical recently worked with IVC Brunel Healthcare at their Swadlincote site on a project focused on optimising stability storage to maximise their available space.
Collaborating closely with their QC Validation & Stability Manager, we conducted detailed site assessments and buildability reviews. By optimising vertical space and reconfiguring the layout, we achieved a capacity increase of more than 200%, all within the same building facility footprint.

Optimising Stability Storage to Maximise Space:
MB3 Technical delivered a turnkey solution that included:
Detailed site layout and buildability assessments
Reconfiguration of storage chambers to maximise vertical and floor space
Mechanical and electrical works to support the optimised layout
Full commissioning and validation in collaboration with the client’s QC Validation & Stability Manager.
Installation of a new cloud-based monitoring system
Why Choose MB3 Technical for Optimising Stability Storage?
This project demonstrates how optimising stability storage can deliver significant capacity gains without the need for facility expansion. If your stability storage chambers are reaching end-of-life or your current setup isn’t fully optimised, MB3 Technical offers tailored fit-out solutions to improve efficiency and meet your operational needs.
Ready to start optimising stability storage in your facility? Contact MB3 Technical to discuss how we can support your next project.